NSN 7310-01-280-0458 NIIN 012800458 — Filler Opening Cap

NSN
Item Name
Assigned
DEMIL
Shelf Life
UOM
Using Services
NSN:
7310-01-280-0458
7310012800458
Description:
CAP,FILLER OPENING
NSN Assigned:
29-MAY-88
DEMIL:
NO
Shelf Life:
N/A
UOM:
1 EA
Using Services:
Marines, Navy, Army, Air Force

Price Quote Get an up to date pricing and availability quote for this product. Order online or over the phone.

Part Number:
Quantity Requested:
Your Email:
Full Name:
Contact Phone:
Company:

Quality Commitment

Serving our customers with quality and safety first.

  •   AS9120 Certified
  •   Audited supply chain
  •   ITAR Registered
  •   DDTC Registered
  •   HAZMAT Certified
  •   Customer service objectives
  •   Every product 100% inspected
AS9120 Certified by SAI Global

7310-01-280-0458 Specification Set by the OEM (see RNCC code 3)

Gripping Accommodation Type ABEZ:

handle

Overall Height ABKW:

2.250in.

Overall Diameter ADAV:

4.625in. ⁓4-5/8"

System For Which Designed AGEJ:

pressurized

Retaining Device Type AGEZ:

chain

Pressure Relief Method ALGN:

manual

Special Features FEAT:

gasket 2.312 in. od x 1.875 in. id x 0.188 in. thk replaced o ring on natick dwg 5-11-1229-4

Material MATT:

copper alloy

Material Document And Classification MDCL:

QQ-B-626 fed spec single material response

Style Designator STYL:

OFF-Set lug type threaded external

Cross Reference Parts Part numbers that meet the specification outlined on this page and set by the OEM

Part Number
Cage
RNCC
RNVC
DAC
RNAAC
Status
MSDS
SADC
Part Number:
5-11-1229-4A
Cage Code:
81337
RNCC:
3
RNVC:
2
DAC:
A
RNAAC:
CX
Status:
A
MSDS:
SADC:

Identification Item Identification Guide (IIG) and Item Name Code (INC)

INC
FIIG
Concept No.
App. Key
Cond. Code
Status
INC:
30128
FIIG:
A083A0
Concept No.:
App. Key:
B
Cond. Code:
2
Status:
A
STYLE DESIGNATOR OFF-SET LUG TYPE THREADED EXTERNAL style nsn 7310-01-280-0458

Definition Definition of approved item name (AIN): "CAP,FILLER OPENING"

A part basically circular in shape, designed to cover or seal the filler-neck or inlet opening of a fuel tank, radiator, oil reservoir, liquid storage tank or the like. It may be either permanently attached to the object for which it is designed or provided with a means of removal and replacement. Excludes cap, vent, fuel storage tank; and cover (1), (as modified).

Packaging & Dimensions Packaging instructions, special markings, and approx. weight/dims

Pack Size
Pack Weight
Item Weight
Item Dim.
Pack Size:
4.7 X 2.3 X 2.3
Paclk Weight:
1.0000lbs
Item Weight:
--
Item Dim:
--
Container
OPI
SPI No.
SPI Rev.
SPC Mkg.
LVL A
LVL B
LVL C
Container:
--
OPI:
O
SPI No.:
SPI Rev.:
SPC Mkg:
00
LVL_A:
E
LVL_B:
Q
LVL_C:
LVL A Code (LVL_A) E

Packing shall be accomplished to meet the performance test requirements of astm-d4169, distribution cycle 18, assurance level 1.

LVL B Code (LVL_B) Q

Packing shall be accomplished in accordance with table c.ii for the packing level specified. closure, sealing and reinforcement shall be in accordance with the appropriate shipping container specification.

Procedure Indicator Code (OPI) O

Options can be exercised as to specific method of preservation or dod approved packaging materials to be used. however, basic preservation method shall be retained, supplemental data shall be complied with, and unit package dimensions shall not be increased by more than one inch. equal or better protection shall be given the item and there shall be no increase in the package cost.

Special Markings Code (SPC_MKG) 00

No special marking.

  Packaging Codes

OPI: Optional Procedure Indicator Code. A one position alpha code that indicates the allowable deviations from the prescribed requirements.

SPI No.: Special packaging instructions number.

LVL A/B/C: Indicates the type of shipping container required for level A, B, or C maximum packing protection.

SPC Mkg: A two position code that identifies the special markings applied to the container, which is part of the total pack to protect the contained item during preservation, packing, storage, transit and removal from the pack.

7310-01-280-0458 Material Hazmat, Precious Metals, Criticality, Enviroment, and ESD

HMIC
PMIC
ESD
ENAC
ADPE
CRITL
HMIC:
N
PMIC:
A
ESD:
ESD:
ADPE:
CRITL:
X
Hazmat (HMIC) N

Indicates there is no data in the hmirs and the nsn is in a fsc not generally suspected of containing hazardous materials.

Precious Metals (PMIC) A

Item does not contain precious metal.

Criticality X

The item does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application.

  Identification Codes

HMIC: Hazardous Material Indicator Code. A one position code that identifies a hazardous item.

PMIC: Precious Metal Indicator Code. A one position code which identifies items that have precious metals as part of their content. precious metals are those metals generally considered to be uncommon, highly valuable, and relatively superior in certain properties such as resistance to corrosion and electrical conductivity.

ESD: Electrostatic Discharge. Indicates if an item is susceptible to electrostatic discharge or electromagnetic interference damage. electrostatic discharge damage occurs when an accumulation of static electricity generated by the relative motion or separation of materials is released to another item by direct contact. electromagnetic interference damage occurs when an item comes into proximity with an electrostatic or magnetic field.

ENAC: Enviromental Attribute Code. Identifies items with environmentally preferred characteristics.

CRITL: Criticality Indicator Code. Indicates an item is technically critical by tolerance, fit, application, nuclear hardness properties, or other characteristics.

Material Management Material categorization and source of supply

SOS
SMIC
MMAC
MCC
SOS:
SMS
SOS:
MMAC:
MCC:
B2
Source of Supply (SOS) SMS

Defense logistics agency, enterprise business systems

  Material Codes

SOS: Source of Supply. A three position code or routing identifier code (ric), which identifies the source of supply activity.

SMIC: Special Material Indicator Code. A two position code, which categorizes material on the basis of requirements for source or quality control, technical design or configuration control, procurement, stocking and issue control, special receipt, inspection, testing, storage, or handling.

MMAC: Material Management Aggregation Code. A two position code that identifies an item of supply to be managed by a specific activity manager.

MCC: Material Echelon Code. A two position code employed by the marine corps in classifying items into categories by materiel category and procurement echelon. the alphanumeric management code is in the first position and identifies the materiel category

IMC: Denotes wether items shall be subjected to integrated management under the defense supply agency or retained by the individual military service or other department of defense components for their management. Assigned by th activity responsible for item management coding.