Serving our customers with quality and safety first.
3a center bulkhead
275.0 deg fahrenheit single response
aircraft, B-2 bomber
plain (tube) all ends
unthreaded external tube all ends
16 center bulkhead
4000.0 pounds per square inch single response
1.125in. center bulkhead ⁓1-1/8"
0.875in. all ends
3.845in.
cryofit connections
titanium alloy
AMS4928 assn std single material response
rigid w/offset wrenching facility
unj center bulkhead
1EA
Unj center bulkhead
Rigid w/offset wrenching facility
Titanium alloy
16 center bulkhead
3a center bulkhead
Schedule B number: 8108908000
nmfc 052190
Other wrought titanium
FSC 4730 ⁓ Hose, pipe, tube, lubrication, and railing fittings
Excluding air conditioning-heating fittings (fsc 4520); bituminized fiber and concrete fittings (fsc 5630); conduit boxes and fittings (fsc 5975); downspout fittings (fsc 5670); medical and surgical fittings (fsc 6515); laboratory fittings (fsc 6640); post caps and rail ends (fsc 5660); machine thread bushings and plugs (fsc 5365).
Used on aircraft, b-2 bomber. unj center bulkhead thread series rigid w/offset wrenching facility cryofit connections 16 center bulkhead thread quantity per inch 3a center bulkhead thread class
1. | AE27616-14 | Cage 00624 |
2. | R45373A-14 | Cage 50599 |
3. | 32363-14 | Cage 14397 |
4. | AFP944T14 | Cage 30974 |
5. | 4P02113-14 | Cage 0S664 |
6. | 07A158 | Cage 1W025 |
7. | 07A158-14 | Cage 1W025 |
Nothing similar to this part number was found in our inventory
A straight fitting 12 inches (304 mm) long or under having the same or different type of connection of the same size on both ends. it is designed to join a tube or tube fitting to another tube or tube fitting. excludes fittings with threaded external connections on both ends. excludes nipple, pipe.